top of page

Long-Hour Schedules Are Becoming Normal, Here’s What That Means for Safety



Workers in safety gear operate orange machinery, tying green straps around a pipe on a truck. Rural landscape, blue sky. "Danger" tape visible.

Six-day work weeks aren’t unusual anymore. On some industrial or mega-projects, it’s 7/12’s, 13 on, 1 off, or even long stretches of work with barely a breath in between. Crews lean into it because the checks are big, the momentum is real, and the pride of pushing through a tough schedule runs deep in the trades.


Nobody’s trying to slow this world down.

It’s part of the job, part of the culture, and part of the reason workers show up.


But these schedules shape safety in ways that aren’t always obvious. Not dramatic “shut the job down” ways, more like a shift in how people think, react, and communicate when the grind becomes the norm.


Here’s what long-hour schedules really do to a jobsite, and how to keep safety strong without trying to fight the OT culture everyone depends on.


Problem #1 When the Days Stack Up, Fatigue Turns Invisible

A single 12-hour shift is manageable.

A few in a row? Still fine.


But 7/12’s or two straight weeks without a real day off create a different kind of fatigue, a low, creeping mental drain that doesn’t show up as “I’m wiped out.” It shows up as:


  • slower reactions

  • missed small hazards

  • zoning out on repetitive tasks

  • forgetting simple steps

  • “autopilot” mode for entire shifts

Workers don’t feel “unsafe.” They feel normal.

But their margin for error shrinks by the day.


Solution: Manage Fatigue Without Cutting Hours

No one wants fewer hours, so the strategy has to work inside the long schedule.


  • 2–3 minute micro-breaks every couple hours

  • task rotation on repetitive jobs

  • foremen checking mental sharpness, not just production

  • hydration + stretching baked into transitions

  • a “reset” moment before high-risk tasks (rigging, line breaking, confined spaces, lifts)


You can run 7/12’s and keep people sharp, but you need to treat fatigue like a real hazard, not a weakness.


Problem #2: Communication Breaks Down Faster Than People Think

On day one, people communicate clearly.

On day five, the radios get shorter.

On day ten, it’s mostly shorthand.

On day thirteen, people communicate like tired roommates.


The pace compresses conversations into:

  • “Just send it.”

  • “Go ahead.”

  • “It’s fine.”

  • “You’re good.”


Those words feel normal, but they’re vague and vague language on a busy jobsite is where close calls hide.


Solution: Short, Predictive Communication

No one wants longer meetings on a 70-hour week.

But everyone benefits from:

  • a two-minute mid-shift huddle

  • daily congestion warnings (“North side is packed today”)

  • color-coded boards for what’s active, offline, or starting

  • supervisors calling out “pressure points” before work starts


Communication doesn’t need to be long it needs to be targeted.


Problem #3: New Workers Burn Out Faster and Make More Mistakes

Veterans can run long hours because they’ve built the mental muscle for it.

New workers? They get overwhelmed quietly and quickly.


On 7/12’s or 13-on rotations, the biggest injury spike is almost always:

  • apprentices

  • first-year workers

  • new-to-industry hires

  • travel hands adjusting to industrial pace


They don’t have the rhythm built yet, and the schedule exposes that.


Solution: Pace-Based Onboarding

Teach them the pace, not just the rules:

  • short, hands-on training

  • shadowing an experienced worker

  • daily check-ins (“Everything making sense?”)

  • visual instructions instead of paragraphs

  • pairing during high-risk tasks


They learn faster and safer without slowing production down.


Problem #4: Long Stretch Schedules Normalize Risk-Taking

After 8+ long days in a row, people start choosing efficiency over caution automatically. Not because they don’t care, because the brain streamlines decisions to survive the grind.

This creates:

  • “I’ve done this a hundred times” mindset

  • overconfidence

  • skipped minor precautions

  • rushing the last 30 minutes of a shift

  • task shortcuts that don’t feel like shortcuts


Solution: “High-Risk Highlighting”

Instead of policing every small thing, focus the crew on the actual danger zones:

  • lifts

  • line breaks

  • energized work

  • heavy equipment

  • pinch points

  • hot work

When workers know which tasks truly bite back, they naturally shift gears.


Problem #5: Pressure Becomes Part of the Air

On long-hour jobs, nobody has to tell the crew the schedule matters. It’s obvious.

But pressure creates its own hazards if you don’t acknowledge it.


Pressure doesn’t make people unsafe, unspoken pressure does.


Solution: Align the Message, Not the Work Pace

Leaders don’t need to tell workers to slow down. They just need to calibrate the tone:


“We’re pushing hard today, make sure you stay sharp.”

Not,

“We’re behind, let’s go.”


Same urgency.

Different impact.


Long-Hour Jobs Can Be Safe, But Not by Accident

Workers want the hours.

Companies want the progress.

Nobody wants the injuries.


The trick is recognizing that 6-day, 7-day, and 13-on schedules create a different environment, and adapting the safety system to fit that world.


You can run high-octane schedules, as long as you:

  • treat fatigue like a real hazard

  • communicate predictively

  • onboard new workers for the pace

  • highlight actual high-risk tasks

  • lead with clarity, not fear

  • build micro-breaks and resets into the rhythm


Safety doesn’t require slowing the job down.

It just requires building systems that keep up with the reality of modern industrial construction.


On your current or most recent project, what’s the normal work schedule?

  • 0%5 days / 8–10 hrs

  • 0%6 days / 10–12 hrs

  • 0%7 days / 12 hrs

  • 0%Rotational (13 on / 1 off or similar)


Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
bottom of page