Incident and audit response
Investigations after an incident, and site walks before an audit.
After an incident
We investigate, talk to the people involved and work the causes with the root cause method that fits the incident, such as a 5-why or an analysis tree. Two business days after we've been on site, you have written preliminary findings: what happened, the immediate causes and what to do right now.
The final report follows once interviews, records and any equipment review are done, on a date we set with you at the start. It covers what happened and in what order, why it happened, and what to change, with a name next to each fix.
Before an audit
Owner audit, prequalification review or an insurance loss-control visit coming up? We walk the site and the paperwork the way the auditor will, and hand you a list of gaps to close before they show up.
Ask why until it stops
Here's how a 5-why works on a sample incident. Tap "Ask why" to go one level deeper each time.
ExampleA laborer's hand was caught in a conveyor pinch point during cleanup.
- Why 1He reached in to clear spillage while the belt was running.
- Why 2Stopping the belt meant walking to a panel at the far end.
- Why 3There was no stop or pull cord within reach of the tail pulley.
- Why 4The cleanup task was never covered in the job hazard analysis.
- Systemic causeCleanup was treated as housekeeping, not as work on energized equipment, so it never got a lockout step.
The analysis tree
Real investigations usually find more than one cause. The tree is where the others show up.
Hand caught at a pinch point
- People
- New to the task
- Nobody had shown him the hazard at the tail
- Equipment
- Spillage builds up at the tail pulley
- Guard has to come off to clean
- Procedure
- No lockout step for cleanup
- Cleanup missing from the JHA
- Site conditions
- Pressure to finish before shift end
- Poor light at the tail section
What changes, and who owns it
- Add belt skirting and a scraper so spillage stops building up at the tail.MaintenanceSpillage checked at the next three shift ends
- Rework the tail guard so cleanup is done from outside it.MaintenanceGuard in place, cleanup done without removing it
- Write a stop, lock and verify step for cleanup into the JHA and the procedure (29 CFR 1926.555(a)(7)).SuperintendentObserved on the next cleanup
- Add a pull cord along the tail section as a backup. It doesn't replace lockout.MaintenanceTested at install, then weekly
- Light the tail section and cover the new step in orientation and a toolbox talk.Site safetySign-in sheet on file
Other services
On-site safety leadership
A safety lead on your site for a day, a phase or the whole job. Daily, weekly and monthly reports, so you know what happened while you were somewhere else.
One-day minimum plus travel
Safety plans and written programs
Plans written for your scope and your site. Word and PDF files your team can edit. Rush is available.
First draft three weeks after kickoff
Safety training and media
Training video shot on your site with your crew and your equipment. Spanish subtitles available. Quoted separately from consulting.
Final cut 45 days after the shoot
Tell us what happened.