There is no OSHA standard for cold stress itself. That surprises people, because there is a standard for almost everything else. OSHA says it plainly on its own cold stress page: although OSHA does not have a specific standard that covers working in cold environments, under the Occupational Safety and Health Act of 1970 employers have a duty to protect workers from recognized hazards, including cold stress hazards.

That duty comes from Section 5(a)(1) of the Act, which requires each employer to "furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees." Cold is a recognized hazard. So the absence of a cold stress standard does not mean there is nothing to comply with.

It means the obligation is general, and the specifics are left to you. Which is why a winter work plan is worth writing down before the first hard freeze instead of after it. What the cold actually does to a crew The named conditions are hypothermia, frostbite, trench foot and chilblains. Hypothermia is a drop in body temperature below 95 degrees Fahrenheit.

OSHA calls uncontrollable shivering an important mild symptom, and its language on that is worth repeating on site: it should not be ignored. As it progresses you get loss of coordination, confusion, slurred speech, a slowed heart rate and breathing, and eventually unconsciousness. The dangerous part for a construction crew is the middle of that list.

A worker who is confused and uncoordinated is still walking around, still holding tools, still climbing a ladder. Frostbite shows up as reddened skin, then gray or white patches on fingers, toes, nose and ear lobes, with tingling, aching, loss of feeling, skin that goes firm or hard, and blisters.

Trench foot is a non-freezing foot injury from prolonged exposure to wet and cold, and it can happen at temperatures as high as 60 degrees if the feet stay wet. Chilblains is a painful inflammation of the small blood vessels in the skin, from repeated exposure to temperatures just above freezing up to about 60 degrees.

Both get missed, because neither needs an arctic front and neither announces itself in minutes. None of this requires a cold snap. OSHA notes that in regions not accustomed to winter weather, temperatures near freezing are enough to be a factor in cold stress. A 38 degree day with rain and wind, on a crew with no dry place to warm up, is a cold stress day.

Temporary heat is where the citations live This is the part of winter work with a specific standard behind it, and it is detailed. 29 CFR 1926.154 covers temporary heating devices. Clearance to combustible material is set by Table F-4. A circulating room heater needs 12 inches at the sides, 12 inches at the rear, and 18 inches at the chimney connector.

A radiant room heater needs 36 inches at the sides, 36 inches at the rear, and 18 inches at the chimney connector. Heaters listed and approved for smaller clearances can be installed to those approvals, and nothing else can. Heaters not suitable for use on wood floors cannot be set directly on them or on other combustible material.

They go on insulating material, or on at least one inch of concrete, or the equivalent, and that insulating material has to extend two feet or more beyond the heater in every direction. Heaters near combustible tarpaulins, canvas or similar coverings have to be at least ten feet away from them, and the coverings have to be fastened securely enough that wind cannot blow them into the heater or upset it.

Anyone who has worked inside a winter enclosure knows how fast a loose tarp moves. Heaters have to be set horizontally level when in use, unless the manufacturer's markings permit otherwise. Solid fuel salamanders are prohibited in buildings and on scaffolds, full stop. Ventilation is its own requirement.

Fresh air has to be supplied in quantities sufficient to maintain health and safety, with mechanical ventilation where natural ventilation is not adequate, and special care taken in confined spaces to provide enough air for proper combustion as well as for the people in there. Carbon monoxide is the reason that paragraph exists.

If you write down one thing from this article before December, write down who walks the enclosures every morning and checks heater clearances, ventilation and fuel. The light goes before the temperature does By mid November a Midwest crew is loading out in the dark. Illumination has a standard too, 29 CFR 1926.56, and Table D-3 sets the minimums while any work is in progress.

General construction area lighting is 5 foot-candles. General construction areas including concrete placement, excavation and waste areas, access ways, active storage areas, loading platforms, refueling and field maintenance areas are 3 foot-candles. Indoor warehouses, corridors, hallways and exitways are 5. General construction plant and shops are 10. First aid stations, infirmaries and offices are 30.

Three foot-candles over an access way is not much, and most jobs that fall short of it fall short at the end of the day, in exactly the areas people walk through to leave. Temporary lighting is one of the easier things to get in front of if somebody owns it.

What a winter work plan should cover OSHA's own cold stress guidance is a good starting list, and it is short enough that there is no excuse for leaving it out of a plan. Train the crew to recognize cold stress, meaning the conditions that cause it, the symptoms, and how to pick clothing for cold, wet and windy work. Monitor workers' physical condition.

Schedule frequent short breaks in warm dry areas, and schedule the work itself during the warmest part of the day where the sequence allows it. Use the buddy system, so somebody notices the confusion and slurred speech the affected worker will not notice in themselves. Provide warm sweet beverages and avoid alcohol. Snack on high carbohydrate foods. Avoid touching cold metal or wet surfaces with bare skin.

Use engineering controls such as radiant heaters where the work is stationary. OSHA's list stops there. Add one thing to it: the training has to be in the language the crew actually speaks. Beyond that, the things that bite a Midwest job in winter are access and change. Snow and ice turn a cleared access route into a fall hazard overnight.

A freeze and thaw cycle changes soil conditions, and 1926.651(k)(1) already requires the competent person's excavation inspection prior to the start of work and as needed throughout the shift, plus after every rainstorm or other hazard increasing occurrence, wherever employee exposure can reasonably be anticipated. A thaw is exactly the kind of change that language is built to catch.

Whether your competent person treats it that way is a matter of what you told them to look for. None of this is complicated. It is mostly a question of who owns it before the weather arrives rather than after. Related reading Your Severe Weather Plan Is a Paragraph Nobody Has Read When the Safety Card Is Real and the Training Never Happened A Trench Box Protects the People Inside It. Nobody Else.