At a glance Two ways to comply with 1926.1153, and you pick one: follow Table 1 for the task, or run your own exposure assessment. Table 1 names the control and the respirator for each listed task. Follow it fully and you skip the air sampling. Indoors or in an enclosed area changes the respirator answer for the same tool, the same material and the same cut.
Table 1 does not get you out of the written exposure control plan, the competent person, housekeeping or medical surveillance. The arguments on site are almost always a lookup nobody did, not a disagreement about health. A carpenter cuts block outside all morning with a dry saw. Nobody says anything.
The next week the same man makes the same cuts with the same saw inside a shell that got closed in over the weekend, and now he is out of compliance before lunch. Same tool. Same material. Same cuts. The respirator answer changed because the walls went up. That is the part of the silica rule that catches crews, and it is not really a health question.
It is a lookup. OSHA wrote the lookup table for you, and most of the arguments on a jobsite happen because nobody has read it. Once a space is closed in, it is an enclosed area, and several Table 1 tasks change their respirator requirement the day that happens. Two ways to comply, and you pick one The construction silica standard is 29 CFR 1926.1153.
Underneath everything it sets a permissible exposure limit of 50 micrograms per cubic meter of air as an 8-hour time-weighted average, and an action level of 25 micrograms per cubic meter, also as an 8-hour TWA. Those numbers matter, but most contractors never measure them, because the standard gives a second road. Paragraph (c), Table 1.
For eighteen listed tasks, OSHA names the engineering control, the work practices and the respirator. Fully and properly implement what is listed, and you have complied for that task. Paragraph (d), assess and limit. For any task not on Table 1, or any task where the Table 1 controls are not fully and properly implemented, you assess the exposure and you meet the PEL.
The word doing the work in that first option is fully. Running a saw with the water tank empty is not partial compliance with Table 1. It drops the whole task into paragraph (d), where you now owe an exposure assessment you almost certainly have not done. Table 1, for the tasks that actually show up This is the abridged version.
The full table runs eighteen tasks with the complete control language. Task Required control, abridged Location 4 hr or less More than 4 hr Handheld power saws (any blade diameter) Integrated water delivery feeding water continuously to the blade Outdoors none APF 10 Handheld power saws (any blade diameter) Integrated water delivery feeding water continuously to the blade Indoors APF 10 APF 10 Walk-behind saws Integrated water delivery feeding water continuously to the blade Outdoors none none Walk-behind saws Integrated water delivery feeding water continuously to the blade Indoors APF 10 APF 10 Rig-mounted core saws or drills Integrated water delivery supplying water to the cutting surface Either none none Handheld and stand-mounted drills Shroud or cowling with dust collection; HEPA vacuum to clean holes Either none none Jackhammers and handheld chipping tools Water at the point of impact, or a shroud with dust collection Outdoors none APF 10 Jackhammers and handheld chipping tools Water at the point of impact, or a shroud with dust collection Indoors APF 10 APF 10 Handheld grinders, mortar removal (tuckpointing) Shroud with dust collection, 25 cfm or more per inch of wheel diameter Either APF 10 APF 25 Handheld grinders, other than mortar removal Integrated water delivery, or a shroud with dust collection Outdoors none none Handheld grinders, other than mortar removal Integrated water delivery, or a shroud with dust collection Indoors none APF 10 Walk-behind milling machines and floor grinders Integrated water delivery, or the manufacturer's dust collection; HEPA vacuum between passes indoors Either none none Two things worth noticing in that table.
Tuckpointing is the outlier. It is the only task here that ever requires an APF 25 respirator, and it requires a respirator even for a short shift. A half-mask will not get you there past four hours. Duration is per shift, not per task. Three separate forty-minute cuts is two hours of saw time, not three short jobs.
Indoors is the line people trip over Four of the tasks above change their answer based on whether the work is outdoors or in an enclosed area. That is the single most common gap, because the building changes around the crew while the plan stays the same. A slab poured in open air and cut two months later inside a closed shell is a different row in the table.
Temporary walls, visqueen and shrink wrap can create an enclosed area without anyone deciding to create one. The crew that cut outdoors last week has no reason to think anything changed, because from where they stand nothing did. This is a scheduling problem as much as a dust problem. Whoever owns the silica plan has to know the enclosure sequence, which means reading the same lookahead the superintendent reads.
What Table 1 does not get you out of Following Table 1 handles the exposure controls and the respirator for that task. It does not end the obligation. A written exposure control plan. It has to describe the tasks that involve exposure, the controls and respirators used, the housekeeping measures, and the procedures for restricting access to work areas. It gets reviewed at least annually. A competent person.
Designated, and making frequent and regular inspections of job sites, materials and equipment, with authority to take prompt corrective measures. Housekeeping limits. No dry sweeping or dry brushing where it could contribute to exposure, unless wet methods or HEPA vacuuming are not feasible. No compressed air to clean clothing or surfaces where it could contribute to exposure, unless the air is used with a ventilation system that captures the dust, or no alternative is feasible.
Medical surveillance. Offered at no cost to any employee required to wear a respirator under this section for 30 or more days per year. That counter runs across tasks, so a man who tuckpoints a few days a month gets there faster than anyone expects.
The written plan is where most of the citations live, because it is the one piece a compliance officer can ask for and read on the spot. Frequently Asked Questions Does a dust shroud alone satisfy Table 1? Only where the table lists one for that task, and only at the airflow and filtration the entry specifies.
For tuckpointing grinders, for example, the dust collector has to provide 25 cfm or more per inch of wheel diameter. A shroud that is not keeping up is not full implementation. What counts as an enclosed area? The standard pairs "indoors" with "enclosed area" rather than defining a square footage. The practical test on site is whether the dust has anywhere to go.
If the space has been closed in to hold heat or keep weather out, treat it as enclosed. If we follow Table 1, do we still have to do air sampling? No. Fully and properly implementing the listed controls is the alternative to assessing exposures for that task. The moment the controls are not fully implemented, or the task is not listed, you are back under paragraph (d).
Does the 30-day medical surveillance trigger reset per project? It is counted per year, not per project. For a contractor whose crews move between jobs, nobody on a single site sees the whole count, which is why it gets missed. Who should be the competent person for silica?
Someone who is actually on the site often enough to make frequent and regular inspections, and who has the authority to stop a task and change it. The designation is worth very little if the person holding it cannot halt a cut. Key Takeaways The silica PEL is 50 micrograms per cubic meter as an 8-hour TWA, with an action level of 25.
Table 1 is a lookup, not a guideline. Fully and properly implementing it is compliance for that task. Partial implementation is not partial credit. It moves the task to paragraph (d) and an exposure assessment. Four common tasks change their respirator requirement when the work moves into an enclosed area. Tuckpointing is the only task on this list that reaches APF 25.
Table 1 never covers the written plan, the competent person, housekeeping limits or medical surveillance. Related reading What a repeat OSHA citation means, and why your prequal misses it OSHA penalties in 2026: the paperwork costs more than the hazard Our toolbox talk library, if you want this in a form a foreman can read to a crew.
Sources 29 CFR 1926.1153, Respirable crystalline silica (OSHA) 29 CFR 1926.1153 full text including Table 1 (eCFR) Small Entity Compliance Guide for the Respirable Crystalline Silica Standard for Construction (OSHA) TriCore Safety is a construction and industrial safety consulting firm founded by Chris Fredette, CHST. We write exposure control plans and walk them in the field to see whether they match the work. Tell us about the job.
At a glance Two ways to comply with 1926.1153, and you pick one: follow Table 1 for the task, or run your own exposure assessment. Table 1 names the control and the respirator for each listed task. Follow it fully and you skip the air sampling. Indoors or in an enclosed area changes the respirator answer for the same tool, the same material and the same cut.
Table 1 does not get you out of the written exposure control plan, the competent person, housekeeping or medical surveillance. The arguments on site are almost always a lookup nobody did, not a disagreement about health. A carpenter cuts block outside all morning with a dry saw. Nobody says anything.
The next week the same man makes the same cuts with the same saw inside a shell that got closed in over the weekend, and now he is out of compliance before lunch. Same tool. Same material. Same cuts. The respirator answer changed because the walls went up. That is the part of the silica rule that catches crews, and it is not really a health question.
It is a lookup. OSHA wrote the lookup table for you, and most of the arguments on a jobsite happen because nobody has read it. Once a space is closed in, it is an enclosed area, and several Table 1 tasks change their respirator requirement the day that happens. Two ways to comply, and you pick one The construction silica standard is 29 CFR 1926.1153.
Underneath everything it sets a permissible exposure limit of 50 micrograms per cubic meter of air as an 8-hour time-weighted average, and an action level of 25 micrograms per cubic meter, also as an 8-hour TWA. Those numbers matter, but most contractors never measure them, because the standard gives a second road. Paragraph (c), Table 1.
For eighteen listed tasks, OSHA names the engineering control, the work practices and the respirator. Fully and properly implement what is listed, and you have complied for that task. Paragraph (d), assess and limit. For any task not on Table 1, or any task where the Table 1 controls are not fully and properly implemented, you assess the exposure and you meet the PEL.
The word doing the work in that first option is fully. Running a saw with the water tank empty is not partial compliance with Table 1. It drops the whole task into paragraph (d), where you now owe an exposure assessment you almost certainly have not done. Table 1, for the tasks that actually show up This is the abridged version.
The full table runs eighteen tasks with the complete control language. Task Required control, abridged Location 4 hr or less More than 4 hr Handheld power saws (any blade diameter) Integrated water delivery feeding water continuously to the blade Outdoors none APF 10 Handheld power saws (any blade diameter) Integrated water delivery feeding water continuously to the blade Indoors APF 10 APF 10 Walk-behind saws Integrated water delivery feeding water continuously to the blade Outdoors none none Walk-behind saws Integrated water delivery feeding water continuously to the blade Indoors APF 10 APF 10 Rig-mounted core saws or drills Integrated water delivery supplying water to the cutting surface Either none none Handheld and stand-mounted drills Shroud or cowling with dust collection; HEPA vacuum to clean holes Either none none Jackhammers and handheld chipping tools Water at the point of impact, or a shroud with dust collection Outdoors none APF 10 Jackhammers and handheld chipping tools Water at the point of impact, or a shroud with dust collection Indoors APF 10 APF 10 Handheld grinders, mortar removal (tuckpointing) Shroud with dust collection, 25 cfm or more per inch of wheel diameter Either APF 10 APF 25 Handheld grinders, other than mortar removal Integrated water delivery, or a shroud with dust collection Outdoors none none Handheld grinders, other than mortar removal Integrated water delivery, or a shroud with dust collection Indoors none APF 10 Walk-behind milling machines and floor grinders Integrated water delivery, or the manufacturer's dust collection; HEPA vacuum between passes indoors Either none none Two things worth noticing in that table.
Tuckpointing is the outlier. It is the only task here that ever requires an APF 25 respirator, and it requires a respirator even for a short shift. A half-mask will not get you there past four hours. Duration is per shift, not per task. Three separate forty-minute cuts is two hours of saw time, not three short jobs.
Indoors is the line people trip over Four of the tasks above change their answer based on whether the work is outdoors or in an enclosed area. That is the single most common gap, because the building changes around the crew while the plan stays the same. A slab poured in open air and cut two months later inside a closed shell is a different row in the table.
Temporary walls, visqueen and shrink wrap can create an enclosed area without anyone deciding to create one. The crew that cut outdoors last week has no reason to think anything changed, because from where they stand nothing did. This is a scheduling problem as much as a dust problem. Whoever owns the silica plan has to know the enclosure sequence, which means reading the same lookahead the superintendent reads.
What Table 1 does not get you out of Following Table 1 handles the exposure controls and the respirator for that task. It does not end the obligation. A written exposure control plan. It has to describe the tasks that involve exposure, the controls and respirators used, the housekeeping measures, and the procedures for restricting access to work areas. It gets reviewed at least annually. A competent person.
Designated, and making frequent and regular inspections of job sites, materials and equipment, with authority to take prompt corrective measures. Housekeeping limits. No dry sweeping or dry brushing where it could contribute to exposure, unless wet methods or HEPA vacuuming are not feasible. No compressed air to clean clothing or surfaces where it could contribute to exposure, unless the air is used with a ventilation system that captures the dust, or no alternative is feasible.
Medical surveillance. Offered at no cost to any employee required to wear a respirator under this section for 30 or more days per year. That counter runs across tasks, so a man who tuckpoints a few days a month gets there faster than anyone expects.
The written plan is where most of the citations live, because it is the one piece a compliance officer can ask for and read on the spot. Frequently Asked Questions Does a dust shroud alone satisfy Table 1? Only where the table lists one for that task, and only at the airflow and filtration the entry specifies.
For tuckpointing grinders, for example, the dust collector has to provide 25 cfm or more per inch of wheel diameter. A shroud that is not keeping up is not full implementation. What counts as an enclosed area? The standard pairs "indoors" with "enclosed area" rather than defining a square footage. The practical test on site is whether the dust has anywhere to go.
If the space has been closed in to hold heat or keep weather out, treat it as enclosed. If we follow Table 1, do we still have to do air sampling? No. Fully and properly implementing the listed controls is the alternative to assessing exposures for that task. The moment the controls are not fully implemented, or the task is not listed, you are back under paragraph (d).
Does the 30-day medical surveillance trigger reset per project? It is counted per year, not per project. For a contractor whose crews move between jobs, nobody on a single site sees the whole count, which is why it gets missed. Who should be the competent person for silica?
Someone who is actually on the site often enough to make frequent and regular inspections, and who has the authority to stop a task and change it. The designation is worth very little if the person holding it cannot halt a cut. Key Takeaways The silica PEL is 50 micrograms per cubic meter as an 8-hour TWA, with an action level of 25.
Table 1 is a lookup, not a guideline. Fully and properly implementing it is compliance for that task. Partial implementation is not partial credit. It moves the task to paragraph (d) and an exposure assessment. Four common tasks change their respirator requirement when the work moves into an enclosed area. Tuckpointing is the only task on this list that reaches APF 25.
Table 1 never covers the written plan, the competent person, housekeeping limits or medical surveillance. Related reading What a repeat OSHA citation means, and why your prequal misses it OSHA penalties in 2026: the paperwork costs more than the hazard Our toolbox talk library, if you want this in a form a foreman can read to a crew.
Sources 29 CFR 1926.1153, Respirable crystalline silica (OSHA) 29 CFR 1926.1153 full text including Table 1 (eCFR) Small Entity Compliance Guide for the Respirable Crystalline Silica Standard for Construction (OSHA) TriCore Safety is a construction and industrial safety consulting firm founded by Chris Fredette, CHST. We write exposure control plans and walk them in the field to see whether they match the work. Tell us about the job.